Current Activities


 

Expedition 2010 is underway!

  • Skylight departed Los Angeles Harbor on Saturday, Feb 27th
  • Inital shake down cruise was to Catalina Island where some mechanical issues were addressed (arrival Sat, Feb 27, 27nm)
  • Next leg was to Bahia Magdelena, Mexico (arrival Sat, Mar 12, 640nm)

Major Accomplishments:

  • Acquired support vessel for Expedition 2010 via Bargin Sale Donation!!!
  • Moved vessel from MA to CA and reassembled
  • Gaining sailing experience to prepare for the the expedition (ongoing)
  • Acquired a 4-stroke low polution outboard motor and inflatable via donations
  • Partnered with Antelope Valley Boys and Girls Club
  • Major outfitting of "Skylight" is nearing completion!
  • Acquisition of route planning software, navagation software, electroniccharts, and physical charts
  • Provisioning has started (ongoing)

Expedition 2010 Activities:

  • Initial route planning and timetable (ongoing)
  • Define high level data collection goals (completed)
  • Review sampling and data collection methods (in progress)
  • Acquire tools necessary to field test reef monitoring methods (completed)
  • Field Trials of basic reef monitoring methods (completed)
  • Review and rework reef monitoring methods and methodologies (ongoing)
  • Train staff on ReefCheck methodologies (completed)
  • Secondary Field Trials (Completed utilizing ReefCheck guidelines)
  • Decide if ReefCheck Pacific protocals are appropriate for RisingTides (looks like it but a final decision hasn't been made 
  • Develop list of water sampling equipment needed for Expedition 2010 (basic list completed)
  • Start gathering water sampling equipment (still need sponsors!!!)
  • Field Test water sampling equipment and protocals
  • T-Shirts and hats are now available for a small donation

 "Skylight" Maintenance and Upgrades

Topside:

  • Replaced anchor light with LED
  • Stepped Mast
  • Rewired mast, radar, etc.
  • Installed new Mast Boot
  • Re-Installed Pulpit and mast rails
  • Re-installed Lifelines
  • Re-Installed Dorad Boxes and Dorad's
  • Re-Installed running rigging including Main and headsail furling lines
  • Re-Installed Steering Pedestal and associated wiring
  • Added 300' of new 3/8" BB chain road
  • Added a Delta anchor and rode
  • Rebedded Running Rigging attachment points
  • Polished Cabin top and Cockpit Coaming
  • Refinished decks with Cetol
  • Replaced stay-sail blocks
  • Refinished Toe Rail (100')
  • Refinished grab rails
  • Refinished accent strips
  • Refinished Cockpit Coaming
  • Refinished Lazerette covers
  • Removed Pushpit, plugged and refinished stern deck
  • Wired hot water heater
  • Installed Cruising Arch
  • Installed Solid rail (lifelines) around rear 1/3rd of boat
  • Constructed and added SCUBA tank racks
  • Added Solar Panels and charge controller
  • Added Wind Generators and control boxes
  • Sewed and installed Bimini
  • Added Cockpit Lights
  • Added Wind Vane
  • Installed LED Running Lights
  • Acquired and repaired dinghy and outboard motor
  • Recovered Life Ring
  • Added 406 EPIRB with GPS
  • Mounted MOB Strobe, Life Ring, and Throw Ba
  • Modified Lifelines and Stern Gate

Bottom:

  • Sanded and re-coated bottom
  • Replaced Zincs
  • Polished Trim
  • Rubbed out and polished hull

Inside:

  • Cleaned and painted most lockers
  • Polished all portholes
  • Repaired wash-down hose
  • Replaced holding tank
  • Replaced Main Head
  • Replaced all black water plumbing
  • Repaired fresh water leaks
  • Replaced faucet in head
  • Repaired and refinished wood in head
  • Added shelves to large hanging cabinet
  • Repaired Mast Leak and Saloon wood
  • Installed Carbon monoxide detector
  • Installed Smoke Detectors
  • Cleaned out 14" of junk from deep bilge
  • Added Flat Panel Computer Monitor
  • Replaced Starter
  • Rebuilt plugged Racor Filters
  • Found and repaired "Mystery" leak in the galley
  • Removed Galley headliner, repaired rot, and replaced
  • Removed Engine driven refrigerator compressor
  • Built mounts and added 10kw engine driven generator
  • Replaced/rerouted engine cooling hoses
  • Replaced and relocated main bilge pump switch
  • Added High Volume bilge pump and alarm
  • Removed engine driven refrigeration components
  • Rebuilt main bilge pump
  • Removed and repositioned all pumps
  • Removed aft head and plumbing
  • Added intake and sea strainer for DC refrigeration and Watermaker
  • Added overboard dump for DC refrigeration and Watermaker
  • Installed custom built watermaker
  • Repaired and repainted refrigeration box
  • Constructed and installed DC refrigeration system
  • Installed LED lighting in Saloon and cabins
  • Added POE injector for external WiFi system
  • Added wireless router for onboard WiFi
  • Built and tested omni and directional WiFi antennas
  • Repaired NME 0183 wiring to/from DSC VHF
  • Added electronic charts for Western US and Pacific
  • Installed Airmail/Winlink software
  • Installed route planning software
  • Installed navigational software and world charts
  • Added AIS receiver and integrated into NMEA 0183 network
  • Added backup GPS and integrated into NMEA 0183 network
  • Constructed mounts and install SCUBA Compressor
  • Installed SSB Radio
  • Installed Antenna tuner and connection to insulated back-stay
  • Replaced SSB ground system
  • Added Pactor III modem and integrate with Laptops

Established 2005
Copyright © 2005-2009 RisingTides, Inc.

All Rights Reserved